Rooftop Solar EPC · Greater Noida & UP
Stop Paying Bills.
Start Owning Power.
Aadion Solarergy designs and installs rooftop solar for homes, colonies, builder floors and small commercial properties across Greater Noida, Noida and UP.
3 kW system
₹4,500
₹1,200/month
5 kW system
₹8,000
₹1,800/month
10 kW system
₹15,000
₹3,500/month
Indicative EMI snapshot — final figures are shared after a site assessment.
1+ years in solar & electrical work · Serving Greater Noida, Noida & UP since 2025

Turnkey execution
Survey · Design · Installation · Commissioning · Support
Solar projects should begin with the site — not a sales pitch.
- 01
Site-focused planning
Every recommendation starts with the roof, the load and the electrical setup.
- 02
End-to-end execution
Assessment, design, supply, installation and commissioning stay coordinated.
- 03
Technical installation
Structures, cabling, protection and integration handled to engineering standards.
- 04
Long-term support
Inspection, troubleshooting and maintenance support after commissioning.
Why it matters
What actually sits on your roof — and what each part does.
Illustrative layout. The exact configuration for your property is confirmed after a site assessment.
Solar Panels
Convert sunlight into DC electricity across your shadow-free roof area.
Mounting Structure
Holds the array at the right tilt and withstands local wind loads.
Inverter
Converts panel DC output into usable AC power for your premises.
DC & AC Protection
Breakers, fuses and SPDs isolate faults before they reach equipment.
Net Meter
Records import and export so grid credits are accounted correctly.
Battery Storage
Optional backup that stores surplus generation for outages.
Earthing & LA
Grounding and lightning protection keep the system and people safe.
Monitoring
Generation data makes underperformance visible early.
Solutions
Solar solutions for every kind of energy requirement.
Why Aadion
Solar is an investment. The execution should be taken seriously.
Choosing solar is not simply about buying panels.
The right system depends on electricity consumption, available space, site conditions, electrical infrastructure and long-term energy requirements.
Aadion Solarergy approaches each project with that bigger picture in mind — combining site assessment, system planning, installation and commissioning into one coordinated process.
- 01
Site-focused design
System configuration follows site conditions, not a fixed package.
- 02
Technical execution
Structural, electrical and safety work handled as engineering work.
- 03
Transparent process
Clear scope, clear stages and clear communication at every step.
- 04
Long-term support
A working system matters more than a completed sale.
Process
From your first enquiry to a working solar system.
01
Understand
Discuss electricity usage, property and energy objectives.
02
Assess
Evaluate rooftop conditions, electrical requirements and site characteristics.
03
Design
Develop the solar system configuration around the project requirements.
04
Execute
Handle installation, electrical integration and commissioning.
05
Support
Provide inspection, troubleshooting and maintenance support.
Solar EPC
One project. One coordinated execution.
Engineering, procurement and construction stay under one coordinated scope, so responsibility does not get divided between vendors mid-project.
EPC Execution Sequence
- Assessment
- Engineering
- Procurement
- Installation
- Testing
- Commissioning
- Support
Illustrative Solar System Flow
- Solar Panels
- DC Protection
- Inverter
- AC Protection
- Meter
- Grid / Load
Illustrative only. System configuration varies by site, and not every Aadion project uses exactly this arrangement.
Solar Economics
Don't just look at the cost. Look at the energy you're buying for years.
Electricity is a long-term operating expense.
A properly designed solar system can help reduce dependence on grid electricity and improve long-term energy planning.
- 01Grid Electricity
- 02Solar Investment
- 03Solar Generation
- 04Reduced Grid Dependence
- 05Long-Term Energy Value
Residential · Government Scheme
Exploring rooftop solar under PM Surya Ghar?
Eligible residential consumers may be able to access Central Financial Assistance under the PM Surya Ghar: Muft Bijli Yojana through the applicable rooftop-solar process.
Aadion can help customers understand the installation journey and required coordination.
Government scheme eligibility, subsidy amounts and application requirements are subject to applicable rules and verification.
Customer Stories
Customer Experiences, Real Solar Installations
Every solar installation is a commitment to quality, transparency and dependable service. Here’s what our customers have to say about their experience with Aadion Solarergy.
The entire solar installation process was smooth and professional. The team explained everything clearly and completed the work properly. I’m happy with the installation and the overall experience with Aadion Solarergy.
Rahul Kumar
Karhal, Mainpuri, Uttar Pradesh
Rooftop Solar Power System
The team was professional and helpful throughout the installation process. They explained everything clearly and completed the work on time. I’m satisfied with the entire experience and the quality of the installation by Aadion Solarergy.
Ramvir Singh
Mainpuri, Uttar Pradesh
Rooftop Solar Power System
Ready to Explore Solar for Your Property?
Talk to our team to understand your rooftop solar options and get a personalised consultation.
Requirement Estimator
How much solar might your property need?
Answer four quick questions. We use them as a starting point — the actual configuration is confirmed only after a site assessment.
Free quote
Tired of an electricity bill that only ever goes up?
Share a few details and our team will get in touch to understand your requirement and plan a site assessment.
- Phone
- +91 9599937003
- Office
- Plot No. 330, Block-N, Luksar, Kasna Industrial Area, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh – 201310
FAQs
Questions we are asked before every project.
- Cost depends on system size, the type of structure required, module and inverter selection, cabling distances and the electrical work involved at your site. Because these vary from property to property, we share pricing only after a site assessment rather than quoting a fixed figure upfront.
- System sizing is based on your electricity consumption pattern, sanctioned load, available shadow-free rooftop area and what you want solar to cover. We review these together before proposing any configuration.
- Yes. We handle residential rooftop solar projects, including site assessment, system design, installation, commissioning and coordination of the required documentation.
- Yes. We take on commercial and industrial solar work where engineering, electrical integration and structured project execution are part of the scope.
- We assist customers with the net-metering coordination and documentation that applies to their connection and location. Approvals and timelines are decided by the concerned distribution utility.
- Yes. We offer inspection, troubleshooting and maintenance support after commissioning. The scope is agreed based on the system and site.
- Timelines depend on system size, site readiness, material availability and utility-side processes. We share an indicative schedule for your specific project after the site assessment.
- Eligible residential consumers may be able to access Central Financial Assistance under the PM Surya Ghar: Muft Bijli Yojana through the applicable rooftop-solar process. Eligibility, amounts and requirements are subject to the rules in force and to verification, so we help customers understand the process rather than promise an outcome.





